On the morning of November 26, 2025, the streets of Inner Mongolia were still shrouded in biting cold, with the thermometer needle frozen at 0°C. The

I. Project completion informationInstallation project: transmission line underground cable Safety inspection caseProject time: 2024.09.03P

2024.08.30 Cable terminal tower field video surveillance system Installation case

2024.08.16 high-voltage cable fault and hidden danger monitoring device Installation case

2024.08.12 high-voltage cable fault and hidden danger monitoring device Installation case

2024.05.19 High-voltage cable fault and hidden danger monitoring device Installation case

2024.05.14 Intelligent sign post image monitoring device Installation case

Cable sheath ring current online monitoring device, real-time detection of grounded cable ring current data, and through the fiber optic and 4G/GPRS/RJ45 real-time transmission of data to the monitoring center, the monitoring center shows the specific loc